PROJECT EXECUTION PLAN
1 > PRE-FEED
- Scope Definition
- Deliverables:
- Operating & Maintenance Philosophy
- Preliminary DBM (Design Basis Memorandum)
- Preliminary Cost Estimate
- Preliminary Project Schedule
- Preliminary Long Lead Equipment Delivery
- Preliminary Construction Forecast
2 > FEED
(Front End Engineering Design)
Input from Pre-FEED
Preliminary Engineering
Deliverables:
Engineering
Philosophies
Procurement
Estimation
Scheduling
3 > EDS
(Engineering Design Stage)
Input from FEED
Deliverables:
4 > DE
(Detailed Engineering)
5 > CONSTRUCTION
Input from DE
Deliverables:
Engineering
Estimation
Procurement
Scheduling
6 > PRE-COMMISSIONING
Input from Construction
Deliverables:
Engineering
Estimation
Procurement
Scheduling
7 > START UP
8 > PROJECT CLOSE OUT