Summary

Engineering, Procurement & Construction Management

 

  • Philosophies
  • Design Basis Memorandum (DBM)
  • Risk Management
  • Feasibility Study
  • AFE Cost Estimate
  • Project Schedule
  • Cost Tracking
  • Plot Plan
  • PFD
  • P&ID
  • Isometric Drawing
  • General Arrangement Drawing
  • Cause & Effect
  • Electrical Single-Line Diagram
  • Motor Schematic
  • DCS
  • Cable Schedule
  • Motor Data Sheet
  • Delta V Programming
  • PLC Programming
  • SCADA Programming
  • Control Narrative
  • Regulatory
  • ABSA
  • EFR Document
  • Permits
  • Construction – Pipeline Scope of Work
  • Construction – Facility Scope of Work
  • Bid Documents
  • Client Review Process
  • HAZOP
  • Project Management – Construction
  • Pre-Commissioning
  • Start-Up
  • Troubleshooting
  • As-Built Plot Plan
  • As-Built P&ID
  • As-Built Cause & Effect
  • All Purchase Requisitions and Invoices
  • Consultation with Client Operations – Optimization