Project Execution Plan

  • Project Execution Plan
  • Project Execution Plan
  • Project Execution Plan

1 → Pre-FEED

  • Scope Definition
  • Deliverables:
    • Operating & Maintenance Philosophy
    • Preliminary DBM (Design Basis Memorandum)
    • Preliminary Cost Estimate
    • Preliminary Project Schedule
    • Preliminary Long Lead Equipment Delivery
    • Preliminary Construction Forecast

2 → FEED (Front End Engineering Design)

  • Input from Pre-FEED
  • Preliminary Engineering
  • Deliverables:
    • Engineering
    • Philosophies
    • Procurement
    • Estimation
    • Scheduling

3 → EDS (Engineering Design Stage)

  • Input from FEED
  • Deliverables:
    • Project & Mechanical
    • Process
    • Instrumentation & Control
    • Electrical
    • Civil & Structural
    • Procurement
    • Estimation
    • Scheduling
    • Hazard Analysis

4 → DE (Detailed Engineering)

  • Input from EDS
  • Detailed Design Documents
    • Post – HAZOP
  • Deliverables:
    • Mechanical & Process
    • Electrical
    • Instrumentation & Control
    • Civil & Structural
    • Estimation
    • Procurement
    • Scheduling

5 → Construction

  • Input from DE
  • Deliverables:
    • Engineering
    • Estimation
    • Procurement
    • Scheduling

6 → Pre-Commissioning

  • Input From Construction
  • Deliverables:
    • Engineering
    • Estimation
    • Procurement
    • Scheduling

7 → Start Up

  • Input from Pre-Commissioning
  • Deliverables:
    • Engineering
    • Estimation
    • Scheduling

8 → Project Close Out

  • Input from DE, Construction, Pre-Commissioning & Start Up
  • Deliverables:
    • Project Close Out Documents